The new residence hall will be a model of sustainable construction, targeting Passive House standards and incorporating all-electric systems, triple-glazed windows, and a rooftop prepared for solar panels. The design is led by Boston-based William Rawn Associates, and Dimeo Construction is serving as construction project manager.
This transformational campus development project is located on the University’s lower campus and will add 631 beds, housing both undergraduate and summer program students. Construction began in June 2025 and is expected to be completed in spring 2027, with occupancy beginning that summer.

